DESIGN, CONSTRUCTION OF VIGLACERA MY XUAN’S TOILET FILLING SYSTEM
Stage 1:
Survey, design drawing and construction at the factory


STAGE 2:
Complete the product, hand it over, and provide instructions for use to staff who put the machine into operation