DESIGN, CONSTRUCTION OF VIGLACERA MY XUAN’S TOILET FILLING SYSTEM
Stage 1:
Survey, design drawing and construction at the factory
![](https://cokhiminhhoa.com.vn/wp-content/uploads/2023/12/dan-do-rot-bet-xi5-1067x800.jpg)
![](https://cokhiminhhoa.com.vn/wp-content/uploads/2023/12/dan-do-rot-bet-xin-1067x800.jpg)
STAGE 2:
Complete the product, hand it over, and provide instructions for use to staff who put the machine into operation