LINE INSPECTION, WATER TEST AND FINISHED PRODUCT PACKAGING
After the process of surveying and taking requests from customers. The team of engineers has drawn up the design and carried out the process of assembling the inspection, water testing and packaging lines for sanitary ceramic products (toilets) for the factory to meet the production schedule for the new year.
After a 3-month process, assembling and testing many times. The company has handed over and completed the products to the factory.
State 1:
Get customer requests, conduct surveys, and create demo designs
Stage 2:
Make complete drawings and design the chain
Stage 3:
Run tests at the factory. Transportation, assembly at the factory and second test run. Instructions for use for factory staff